home *** CD-ROM | disk | FTP | other *** search
/ Space & Astronomy / Space and Astronomy (October 1993).iso / mac / TEXT / SPACEDIG / V11_3 / V11_362.TXT < prev    next >
Internet Message Format  |  1991-07-08  |  6KB

  1. Return-path: <ota+space.mail-errors@andrew.cmu.edu>
  2. X-Andrew-Authenticated-as: 7997;andrew.cmu.edu;Ted Anderson
  3. Received: from beak.andrew.cmu.edu via trymail for +dist+/afs/andrew.cmu.edu/usr11/tm2b/space/space.dl@andrew.cmu.edu (->+dist+/afs/andrew.cmu.edu/usr11/tm2b/space/space.dl) (->ota+space.digests)
  4.           ID </afs/andrew.cmu.edu/usr1/ota/Mailbox/IaEbN7i00VcJQ7mU49>;
  5.           Sat,  5 May 90 02:44:24 -0400 (EDT)
  6. Message-ID: <saEbMfq00VcJ07kk5v@andrew.cmu.edu>
  7. Reply-To: space+@Andrew.CMU.EDU
  8. From: space-request+@Andrew.CMU.EDU
  9. To: space+@Andrew.CMU.EDU
  10. Date: Sat,  5 May 90 02:43:56 -0400 (EDT)
  11. Subject: SPACE Digest V11 #362
  12.  
  13. SPACE Digest                                     Volume 11 : Issue 362
  14.  
  15. Today's Topics:
  16.            Payload Summary for 05/04/90 (Forwarded)
  17. ----------------------------------------------------------------------
  18.  
  19. Date: 5 May 90 05:06:21 GMT
  20. From: trident.arc.nasa.gov!yee@ames.arc.nasa.gov  (Peter E. Yee)
  21. Subject: Payload Summary for 05/04/90 (Forwarded)
  22.  
  23.  
  24.                                   Status Report
  25.                                   Expendable Vehicles
  26.                                   Kennedy Space Center
  27.  
  28.                                   May 4, 1990
  29.  
  30.  
  31.         George Diller
  32.         407/867-2468
  33.         FTS 823-2468
  34.  
  35.         DELTA/ROSAT
  36.  
  37.              Work is proceeding on schedule at Launch Complex 17 toward a
  38.         May 31 launch of the Delta II rocket which will carry  the  ROSAT
  39.         spacecraft into a 360-statute-mile-high orbit.  Spacecraft check-
  40.         out  and  other  work  to  prepare the satellite for its upcoming
  41.         mating with the Delta vehicle is also on schedule.
  42.  
  43.              ROSAT arrived from Germany aboard a 747 air cargo  plane  on
  44.         Feb.  20  and was taken to NASA's Hangar AE on Cape Canaveral Air
  45.         Force Station to begin processing.  The Wide Field Camera was in-
  46.         stalled in the spacecraft on March 12.  The spacecraft functional
  47.         checks were completed by mid-April.
  48.  
  49.              On Apr.  27, a compatability test with JPL's Deep Space Net-
  50.         work (DSN) was completed.   This week,  end-to-end communications
  51.         testing  is  underway between the spacecraft in Hangar AE and the
  52.         German Satellite Operations Center (GSOC) in Germany.  This over-
  53.         seas project control center can send commands to and receive data
  54.         directly from the spacecraft by way of  trans-Atlantic  satellite
  55.         link. Transportation of ROSAT to the launch pad is planned to oc-
  56.         cur May 17.   Approximately one week later, the satellite will be
  57.         enclosed in the Delta nose fairing.   This is the first flight of
  58.         a new 10-foot diameter fairing.
  59.  
  60.              The Delta rocket was erected on Pad 17-A,  starting with the
  61.         first stage on April 5.   The attachment  of  the  nine  strap-on
  62.         solid rocket motors followed beginning on Apr. 6, with completion
  63.         on Apr. 9.  The Delta second stage was then erected on Apr. 16.
  64.  
  65.              Yesterday,  at  the pad,  the vehicle was loaded with liquid
  66.         oxygen for "LOX Leak Checks" to verify the integrity of the first
  67.         stage.  Today,  a Simulated Flight Test is scheduled.   The exer-
  68.         cise  operates  the  electrical and mechanical systems aboard the
  69.         vehicle,  verifying they will work during the flight as intended.
  70.         Separation of the spacecraft occurs at T+43 minutes.
  71.  
  72.              There  is  a  one  hour  launch window for Delta/Rosat which
  73.         opens at 5:35 p.m.  Eastern time.   This window could be  refined
  74.         somewhat closer to launch.
  75.  
  76.  
  77.         Atlas Centaur AC-69/CRRES
  78.  
  79.              Work  is proceeding toward an approximate mid-June launch of
  80.         an Atlas Centaur vehicle carrying the Combined Release and Radia-
  81.         tion Effects Satellite.   This will be the first flight of an At-
  82.         las Centaur with the  new fairing that is 14 feet in diameter.
  83.  
  84.              The  Atlas  Centaur arrived aboard a C-5 Air Force transport
  85.         plane on April 3.   The Atlas stage was erected on  Pad  36-B  on
  86.         April 4 and the Centaur stage was hoisted atop the Atlas on April
  87.         5.    The  vehicle  was  powered up to begin prelaunch testing on
  88.         April 16.   The only problem encountered has been with one of the
  89.         Centaur hydrogen vent valves which is being replaced.
  90.  
  91.              During the second week of May,  a Simulated Flight test,  or
  92.         plus count,  is scheduled.   The spacecraft separation occurs  at
  93.         approximately  29  minutes into the plus count.   This check will
  94.         operate the vehicle's electrical and mechanical systems,  verify-
  95.         ing they will perform as designed  during the ascent to orbit.
  96.  
  97.              A  countdown  dress rehearsal is scheduled for mid-May which
  98.         will be a full countdown exercise,  including the filling of  the
  99.         vehicle  with  its  full  complement  of liquid hydrogen,  liquid
  100.         oxygen, and RP-1  propellants.
  101.  
  102.              The new 14-foot fairing has been undergoing  final  assembly
  103.         in  the  Payload Hazardous Servicing Facility (PHSF),  located in
  104.         the KSC Industrial Area.   It is being taken to the launch pad on
  105.         Saturday  to  begin fit checks,  electrical tests,  and to verify
  106.         that it will open and separate from the vehicle  properly  during
  107.         the ascent.
  108.  
  109.              The  CRRES  spacecraft  arrived  at  the  PHSF  on March 23.
  110.         Electrical checks and functional testing of the  spacecraft  were
  111.         completed  on April 20.    This week,  the canisters designed for
  112.         releasing the chemicals in orbit were loaded with  their  respec-
  113.         tive  elements and were placed aboard the spacecraft.   There are
  114.         eight small canisters and 16 large canisters  which  collectively
  115.         contain the elements barium, litihium, strontium, and calcium.
  116.  
  117.              On  May 14 three days of spacecraft end-to-end compatability
  118.         tests are scheduled between the CRRES satellite at Cape Canaveral
  119.         and the Air Force Consolidated Satellite Test  Center  (CSTC)  in
  120.         Sunnyvale,  Ca.    This  will  be  the  control  center  for  the
  121.         spacecraft during the mission.   Spacecraft  commands,  telemetry
  122.         and data communications will be verified.